Off-grid solar array at a remote site in Northern BC

Solar panel installation in Smithers, BC

Smithers is 372 km down Highway 16. For larger installs in the Bulkley Valley, and for community and commercial work, it is a drive we are glad to make.

What the distance means

A single small residential array in Smithers is a long way to send a crew, and there are good installers closer to you. Where we are genuinely worth calling is when the job is bigger or more complicated than a straightforward roof: a ground mount, a battery system, an off-grid property, a community or commercial building, or anything that needs an electrical contractor rather than a solar salesperson.

If that is not your job, we will point you somewhere sensible. There is no sense taking a deposit on work we can only get to twice a year.

What we are good at out here

  • Off-grid and hybrid systems. Array, battery bank and automatic generator changeover designed as one system.
  • Community and institutional buildings. Including the provincial rebates when the applicant is an Indigenous governing body: up to $50,000 for solar plus $50,000 for a battery installed with solar.
  • Commercial roofs. Where the payback is modelled on your own consumption and the tax treatment is itemized properly.

The conditions here

Smithers is one of the few communities on our list with a long-running Environment Canada station of its own, so we are not extrapolating: roughly 1,621 hours of bright sunshine and 183 cm of snowfall in an average year, at 500 metres. Prince George Airport gets about 1,918 hours and 205 cm. So a little less sun and a little less snow than Prince George Airport, and the ground snow load is almost the same: 3.5 kPa against Prince George at 3.4.

Which makes Smithers straightforward on paper. The complication is not the climate, it is the topography.

Hudson Bay Mountain is the variable. The Bulkley Valley is narrow and the ground rises hard on both sides. In December and January the sun tracks low, and how much of it reaches your particular property depends on which side of the valley you are on and what stands between you and the southern sky. Two houses ten minutes apart can differ meaningfully. That is a site measurement, not a map reading, and it is the main thing we are doing when we walk the property.

Smithers also has plenty of accommodation and short-term rentals for a town its size. Those have their own load shape — heavy winter occupancy, light summer — which is close to the least favourable pattern for solar, because it consumes when the array produces least. It does not rule anything out, but it changes the size that makes sense, and that arithmetic goes in the quote.

What changed on 1 July 2026

BC Hydro closed net metering to new customers on 1 July 2026. Under the Self-Generation rate that replaced it, the power you export is bought at 10 cents per kWh and credited on every bill rather than settled once a year.

Rebates are still on the table. Up to $5,000 on solar and up to $5,000 on a battery enrolled in the utility’s peak-saving program, or up to $1,500 for a battery installed with solar. But since 1 June 2026 they are only paid when the work is done by a Home Performance Contractor Network member. We are one. If your installer is not, the rebate simply does not get paid.

Want a number before you call? The solar savings calculator uses our own pricing and your actual BC Hydro consumption to size a system and estimate the payback for a home in Smithers.

Tell us what the job is

If we are the right contractor for it, we will quote it. If someone closer is the better fit, we will give you their name.

Get a free quote(250) 532-2873

Nechako Solar is a member of the Home Performance Contractor Network (HPCN), an independent network; you can check that in the HPCN directory.